Methodology
How the sites were found and designed
A short summary. The full methodology, with assumptions and sources for every figure, will be published here and in each data release.
1. Screening
540 screening circles around named places in the eight program counties (Bong, Lofa, Nimba, Gbarpolu, Grand Cape Mount, Grand Gedeh, Grand Kru and Margibi) were merged into 289 service areas using satellite-mapped buildings (Google Open Buildings v3). The 31 areas within 10 km of a mapped power line were left to grid extension, and 77 areas under 100 buildings were set aside, leaving 181. Five of those are on hold while existing or planned grids there are checked, so 176 sites are in the program.
2. Demand and plant sizing
Each site’s hourly load is built from its customer mix (screening assumption: 0.75 connections per structure, mostly residential). A solar-battery-diesel plant is optimized in Phasor over 8,760 hours for the lowest lifetime cost, with diesel limited to backup.
3. Distribution network
Low-voltage networks are routed along roads to the mapped buildings; spread-out sites get medium-voltage spurs and transformers.
4. Finance
Capital and operating costs feed 20-year cash flows at several tariffs, at site, county and program level, discounted at 10%. Every site is planned as 100% grant financed: the headline figure is the operator’s NPV after the grant, where tariff revenue must cover running costs, staff and equipment replacements. The project NPV and IRR, which count the whole build as an investment, are also shown.
Caveats
These are planning figures. They do not establish verified demand, investment readiness or confirmed funding. Building counts are structures, not customers; “people living near” is not a count of people served.