Mini-grid program

Power for the towns the grid won’t reach

Solar mini-grids designed, costed and mapped for rural communities in eight Liberian counties, ready for partners to fund and build.

176

communities

53,596

connections

19.5 MWp

solar

Scroll to explore

Our mission

To improve essential services and economic opportunities in underserved Liberian communities through reliable, affordable, and sustainable energy, supported by practical digital technology.

Health

Maternity care, vaccine refrigeration, laboratories and water supply at clinics in mini-grid towns.

Education

Lighting, digital learning, school administration and vocational training.

Water and community services

Pumping and treatment, essential public facilities, and service reporting.

Livelihoods

Milling, processing, cold storage, workshops and shared business equipment.

Where the grid ends

540

towns and villages checked

  1. Look at every town on the map

    We started with every named town and village in the eight counties: 540 places.

  2. Group them into communities

    Satellite maps of rooftops show which villages run together. Combined, they form 289 communities.

  3. Leave out towns near power lines

    31 communities are within 10 km of a power line. Extending the national grid is the better option there.

  4. The rest need a mini-grid

    We left out 77 communities with under 100 buildings and put 5 on hold where another power project is under way. That leaves 176 sites, typically 36 km from a power line.

How far each community is from a power line

Number of communities at each distance

Near a power line: grid insteadToo small (under 100 buildings)Mini-grid siteOn hold: other power project
02550751000–1010–2020–3030–4040–5050+

Distance to the nearest power line (km)

Based on satellite maps of rooftops (Google Open Buildings) and mapped power lines, November 2026. Lofa County has no power lines on the map, so all of its communities are far from the grid.

How a site is designed

From rooftops to a bankable design

01 / 05

Buildings mapped

Every rooftop in the service area from satellite data, sorted into homes, shops and institutions.

02 / 05

Demand modeled

An hour-by-hour load for a year, built from the customer mix and typical rural appliance use.

03 / 05

Plant sized

Solar, batteries and a small diesel backup, optimized over 8,760 hours for the lowest lifetime cost.

04 / 05

Network routed

Low-voltage lines along roads to each building, with medium-voltage spurs where a town is spread out.

05 / 05

Costed and financed

Capital and operating costs, tariffs and 20-year cash flows, at county and program level.

The portfolio

176 sites across 8 counties

Every site has a sized plant and, for all but a few still in design, a routed distribution network.

01 / 08Central office: Gbarnga

Bong

Sites
21
Connections
6,828
Solar PV
2.5 MWp
Network
160 km
People living near
53,700
02 / 08Central office: Voinjama

Lofa

Sites
59
Connections
18,363
Solar PV
6.4 MWp
Network
408 km
People living near
150,000
03 / 08Central office: Sanniquellie

Nimba

Sites
52
Connections
15,236
Solar PV
5.6 MWp
Network
324 km
People living near
100,900
04 / 08Central office: Zwedru

Grand Gedeh

Sites
13
Connections
4,962
Solar PV
1.9 MWp
Network
91 km
People living near
35,600
05 / 08Central office: Robertsport

Grand Cape Mount

Sites
12
Connections
3,074
Solar PV
1.2 MWp
Network
58 km
People living near
31,200
06 / 08Central office: Barclayville

Grand Kru

Sites
10
Connections
2,975
Solar PV
1.2 MWp
Network
83 km
People living near
35,700
07 / 08Central office: Bopolu

Gbarpolu

Sites
5
Connections
1,301
Solar PV
0.5 MWp
Network
17 km
People living near
6,000
08 / 08Central office: Kakata

Margibi

Sites
4
Connections
857
Solar PV
0.3 MWp
Network
21 km
People living near
5,800

Explore the map

Where the sites are

Every program site, colored by stage. Figures for individual sites are available after sign-in.

Loading map…

Stage

  • Proposed
Sign in for site details

What it delivers

Clean, reliable power, every hour of the year

Simulated over a full year, hour by hour, for every site.

97%Solar share

of the electricity comes from the sun, stored in batteries for the night

96%Diesel avoided

about 4.3 million liters a year not burned, against diesel-only supply

15.0GWh

of electricity a year, simulated hour by hour for every site

419k

people living near the sites

Planning estimates from Phasor simulations. “People living near” counts residents within the screening area (WorldPop), not customers. Diesel avoided assumes a diesel-only system would burn 0.3 L per kWh.

How the program works

From a confirmed need to a maintained system

Each site moves through the same stages. Every record shows its source, when it was last verified and how certain it is.

  1. 01

    Confirm need

    Visit the community, verify demand, anchor loads and any existing systems.

  2. 02

    Agree responsibilities

    Who owns the assets, who operates them, and how maintenance is paid for.

  3. 03

    Prepare

    Final design, permits, procurement packages and a delivery group of five to ten sites.

  4. 04

    Fund

    Grants and concessional finance matched to sites, with every figure traceable to a data release.

  5. 05

    Deliver

    Qualified Liberian contractors build under LEAI supervision.

  6. 06

    Operate and report

    Performance, faults and repairs tracked in the portal and reported to funders.

Governance

Each project names who owns the assets, who operates them and how maintenance is funded, before any money is committed.

Maintenance is a funded service

Budgets cover delivery and an agreed operating period: equipment registers, inspections, fault reports and repairs, tracked in the portal.

Work with us

The designs are done. What these communities need now is partners to verify, fund, build and run them.

Who the portal is for

RREA and LEC

Coordinate mini-grids with grid extension plans.

Developers

Site-level designs, networks and bills of materials to start from.

Funders

Portfolio and county finances, tranche building and investment briefs.

Researchers

Versioned data releases with methods and provenance.

What signing in unlocks

  • Per-site sizing, energy simulation and reliability
  • Distribution network maps: lines, poles, transformers
  • Finance at each tariff studied: the operator's view after the capital grant, and 20-year cash flows
  • Downloads (partners) and site stage tracking

Accounts are approved by LEAI. Partner downloads are logged and need acceptance of the terms of use.