Buildings mapped
Every rooftop in the service area from satellite data, sorted into homes, shops and institutions.
Liberia Energy Access Initiative ·Mini-grid program
Solar mini-grids designed, costed and mapped for rural communities in eight Liberian counties, ready for partners to fund and build.
176
communities
53,596
connections
19.5 MWp
solar
To improve essential services and economic opportunities in underserved Liberian communities through reliable, affordable, and sustainable energy, supported by practical digital technology.
Maternity care, vaccine refrigeration, laboratories and water supply at clinics in mini-grid towns.
Lighting, digital learning, school administration and vocational training.
Pumping and treatment, essential public facilities, and service reporting.
Milling, processing, cold storage, workshops and shared business equipment.
Where the grid ends
540
towns and villages checked
Look at every town on the map
We started with every named town and village in the eight counties: 540 places.
Group them into communities
Satellite maps of rooftops show which villages run together. Combined, they form 289 communities.
Leave out towns near power lines
31 communities are within 10 km of a power line. Extending the national grid is the better option there.
The rest need a mini-grid
We left out 77 communities with under 100 buildings and put 5 on hold where another power project is under way. That leaves 176 sites, typically 36 km from a power line.
How far each community is from a power line
Number of communities at each distance
Distance to the nearest power line (km)
Based on satellite maps of rooftops (Google Open Buildings) and mapped power lines, November 2026. Lofa County has no power lines on the map, so all of its communities are far from the grid.
How a site is designed
Every rooftop in the service area from satellite data, sorted into homes, shops and institutions.
An hour-by-hour load for a year, built from the customer mix and typical rural appliance use.
Solar, batteries and a small diesel backup, optimized over 8,760 hours for the lowest lifetime cost.
Low-voltage lines along roads to each building, with medium-voltage spurs where a town is spread out.
Capital and operating costs, tariffs and 20-year cash flows, at county and program level.
The portfolio
Every site has a sized plant and, for all but a few still in design, a routed distribution network.
Explore the map
Every program site, colored by stage. Figures for individual sites are available after sign-in.
What it delivers
Simulated over a full year, hour by hour, for every site.
of the electricity comes from the sun, stored in batteries for the night
about 4.3 million liters a year not burned, against diesel-only supply
15.0GWh
of electricity a year, simulated hour by hour for every site
419k
people living near the sites
Planning estimates from Phasor simulations. “People living near” counts residents within the screening area (WorldPop), not customers. Diesel avoided assumes a diesel-only system would burn 0.3 L per kWh.
How the program works
Each site moves through the same stages. Every record shows its source, when it was last verified and how certain it is.
Visit the community, verify demand, anchor loads and any existing systems.
Who owns the assets, who operates them, and how maintenance is paid for.
Final design, permits, procurement packages and a delivery group of five to ten sites.
Grants and concessional finance matched to sites, with every figure traceable to a data release.
Qualified Liberian contractors build under LEAI supervision.
Performance, faults and repairs tracked in the portal and reported to funders.
Each project names who owns the assets, who operates them and how maintenance is funded, before any money is committed.
Budgets cover delivery and an agreed operating period: equipment registers, inspections, fault reports and repairs, tracked in the portal.
The designs are done. What these communities need now is partners to verify, fund, build and run them.
Who the portal is for
Coordinate mini-grids with grid extension plans.
Site-level designs, networks and bills of materials to start from.
Portfolio and county finances, tranche building and investment briefs.
Versioned data releases with methods and provenance.
What signing in unlocks
Accounts are approved by LEAI. Partner downloads are logged and need acceptance of the terms of use.